We bring you the complete and important daily QUANT to achieve more marks in Banking, Insurance, UPSC, SSC, CLAT, Railways and all other competitive Exams. We prepare it based on our daily current affairs.Hope you like it.
Directions (1 – 5): Study the following information
carefully and answer the questions give below:
The bar
graph 1 shows the time taken by five pipes (A, B, C, D and E) to fill a tank
The bar graph 2 shows the time taken by five pipes (P, Q, R, S and T) to empty the tank
The following table shows the ratio of time taken by pipes to fill the tank.
1) Pipe A and Pipe B opened
simultaneously for 4 minutes, then closed and then pipe F and pipe Q are opened
for 2 minutes, and then closed. Find the time taken by pipe G to fill the
remaining part of the tank.
a) 7 minutes
b) 139/36
minutes
c) 5 minutes
d) 178/39
minutes
e) None of
these
2)
Efficiency of pipe K is twice the efficiency of pipe A and efficiency of pipe L
is 1.5 times the efficiency of pipe S. Pipe C and pipe K are opened simultaneously
for 3 minutes and then closed. Find the time taken by pipe L and pipe R
together to empty the filled part of the tank.
a) 4 minutes
b) 47/12
minutes
c) 32/5
minutes
d) 5 minutes
e) None of
these 3) Time taken by
pipe M to fill the tank is 20% more than the time taken by pipe I to fill the
tank and efficiency of pipe N is twice the efficiency of pipe J. Time taken by
pipe M and pipe N to fill the tank is what percent of the time taken by pipe D
and pipe E together to fill the tank.
a) 67.67%
a) 67.67%
b) 74.44%
c) 98.48%
d) 81.14%
e) 83.33%
4) Find the
respective ratio of time taken by pipe B, pipe G and pipe P together to fill
the tank to that of time taken by pipe E, pipe H and pipe S together to fill
the tank.
a) 4:5
b) 5:6
c) 6:7
d) 3:4
e) None of
these
5) Pipe A,
pipe C and pipe E are opened simultaneously for 4 minutes then closed and pipe
P and pipe S are opened for 2 minutes then closed. Find the time taken by pipe
G and pipe J to fill the remaining part of the tank.
a) 27/13 days
b) 41/27 days
c) 31/11 days
d) 51/29 days
e)
None of these
Answers :
Direction (1-5):
1) Answer: b)
Part of the
tank filled by pipe A in one minute = 1/12
Part of the
tank filled by pipe B in one minute = 1/15
Time taken by
pipe F to fill the tank = 4/3 x 12 = 16 minutes
Part of the
tank filled by pipe F in one minute = 1/16
Time taken by
pipe G to fill the tank = 2/3 x 15 = 10 minutes
Part of the
tank filled by pipe G in one minute = 1/10
Part of the
tank emptied by pipe Q in one minute = 1/18
Let required
time = t minutes
According to
the question
4/15 + 4/12 +
2/16 – 2/18 + t/10 = 1
=> t/10 = 1
– 4/15 – 1/3 – 1/8 + 1/9
=> t/10 =
(360 – 120 – 90 – 45 + 40)/360
=> t/10 =
139/360
=> t =
139/360 x 10
=> t =
139/36 minutes
2) Answer:
c)
Part of the
tank filled by pipe A in one minute = 1/12
Part of the tank filled by
pipe K in one minute = 2/12 = 1/6
Part of the tank filled by
pipe C in one minute = 1/10
Part of the tank emptied by
pipe S in one minute = 1/24
Part of the tank emptied by
pipe L in one minute = 1.5/24 = 1/16
Part of the tank emptied by
pipe R in one minute = 1/16
Part of the tank filled by
pipe C and pipe K in 3 minutes = 3/10 + 3/6
= (9 + 15)/30
= 24/30
Let the required time taken =
t minutes
t/16 + t/16 = 24/30
=> 2t/16 = 24/30
=> t = 24/30 x 16/2
=> t = 32/5 minutes
3) Answer: c)
Time taken by
pipe I to fill the tank = 5/4 x 8 = 10 minutes
Part of the
tank filled by pipe I in one minute = 1/10
Time taken by
pipe M to fill the tank = 10 x 120/100 = 12 minutes
Part of the
tank filled by pipe M in one minute = 1/12
Time taken by
pipe J to fill the tank = 10/9 x 18 = 20 minutes
Part of the
tank filled by pipe J in one minute = 1/20
Part of the
tank filled by pipe N in one minute = 2/20 = 1/10
Part of the
tank filled by pipe D in one minute = 1/8
Part of the
tank filled by pipe E in one minute = 1/18
Let the time
taken by pipe M and pipe N to fill the tank = t minutes
And the time
taken by pipe D and pipe E to fill the tank = k minutes
t/12 + t/10 =
1
=> (5t +
6t)/60 = 1
=> 11t/60 =
1
=> t = 60/11 minutes
And
k/8 + k/18 = 1
(9k + 4k)/72 = 1
=> k = 72/13 minutes
Required percentage =
(60/11)/(72/13) x 100
= 60/11 x 13/72 x 100
= 98.48%
4) Answer: b)
Part of the
tank filled by pipe B in one minute = 1/15
Time taken by
pipe G to fill the tank = 2/3 x 15 = 10 minutes
Part of the
tank filled by pipe G in one minute = 1/10
Part of the
tank emptied by pipe P in one minute = 1/20
Part of the
tank filled by pipe E in one minute = 1/18
Time taken by
pipe H to fill the tank = 6/5 x 10 = 12 minutes
Part of the
tank filled by pipe H in one minute = 1/12
Part of the
tank emptied by pipe S in one minute = 1/24
Let the time
taken by pipe B, pipe g and pipe P together to fill the tank = t minutes
And the time
taken by pipe E, pipe H and pipe S together to fill the tank = k minutes
t/15 + t/10 –
t/20 = 1
=> (4t + 6t
– 3t)/60 = 1
=> 7t/60 =
1
=> t = 60/7
minutes
And
k/18 + k/12 –
k/24 = 1
=> (4k + 6k
– 3k)/72 = 1
=> 7k/72 =
1
=> k = 72/7
minutes
Required ratio = 60/7: 72/7 =
5:6
5) Answer:
b)
Part of the
tank filled by pipe A in one minute = 1/12
Part of the
tank filled by pipe C in one minute = 1/10
Part of the
tank filled by pipe E in one minute = 1/18
Part of the
tank emptied by pipe P in one minute = 1/20
Part of the
tank emptied by pipe S in one minute = 1/24
Time taken by
pipe G to fill the tank = 2/3 x 15 = 10 minutes
Part of the
tank filled by pipe G in one minute = 1/10
Time taken by
pipe J to fill the tank = 10/9 x 18 = 20 minutes
Part of the
tank filled by pipe J in one minute = 1/20
Let the
required time taken = t minutes
4/12 + 4/10 +
4/18 – 2/20 – 2/24 + t/10 + t/20 = 1
=>1/3 + 2/5
+ 2/9 – 1/10 – 1/12 + (2t + t)/20 = 1
=> (60 + 72
+ 40 – 18 – 15)/180 + 3t/20 = 1
=> 139/180
+ 3t/20 = 1
=> 3t/20 =
1 – 139/180
=> 3t/20 =
(180 – 139)/180
=> 3t/20 =
41/180
=> t =
41/180 x 20/3
=> t =
41/27 days